Free tool

Sub-base and aggregate calculator

Get the area, the volume to dig out and roughly how many tonnes of sub-base to order. A 6 m by 5 m patio at 150 mm deep comes to about 9 tonnes at 2 tonnes per m³.

m
m
mm
t/m³

About 2 tonnes per m³ for compacted Type 1. Check with your supplier.

Your quote lines

LineQtyUnit
Sub-base: 30 m² at 150 mm30m²
Excavation and spoil: 4.5 m³4.5m³
Sub-base material (about 9 tonnes at 2 t/m³)9tonnes

Estimates for quoting, rounded up. Check the figures for your materials and site.

In TradeQuote these lines go straight into a quote, priced from your own rate book.

Start a free trial

How it works

  • Area is length × width. Volume is area × depth.
  • Tonnage is volume × the compacted density you enter, rounded up to a tenth of a tonne.
  • Density varies by material and supplier, so check the figure before you order.

Built into TradeQuote for landscaping quotes, groundworks quotes and builders' quotes.

Questions

How deep should a patio sub-base be?

Often 100 to 150 mm for a patio and more for a drive that takes vehicles. Follow the specification for the job.

How much does a cubic metre of Type 1 weigh?

Roughly 2 tonnes once compacted, but it varies. Use your supplier’s figure.

Stop doing sums on the back of an envelope. Quote it in TradeQuote.

Calculators, rate books and checklists for 34 UK trades. 30 days free, no card needed.