For builders and building contractors

Extensions and Renovations Run Into Five Figures. Builders: Price the Build Stage by Stage, Bill It Stage by Stage, and Let the Chasers, Start Dates and Bookkeeping Sort Themselves.

Builders quoting software UK contractors can price a kitchen extension with should start where you are: sat in the van outside the job, drawings on the passenger seat, client wanting a figure by Friday.

TradeQuote Guru covers the quote, the stage invoices and the admin in between. Reminders, diary bookings and the figures for your accountant carry on while you're on site.

30 days free · No card needed

From the drawings on the passenger seat to a stage price

Talk it through from the driver's seat: ninety seconds on the strip-out, the footings as drawn, walls, roof and making good. Or walk the plot and take four site photos. The AI drafts lines from what you said or showed, and every number on them is yours to fill in, because it doesn't price a thing. Your plan runs to a hundred AI assists a month, plus an hour of dictation.

Start from the extension (stage price) template or the brick or block wall template. Builders' units already sit in the rate book, each at £0 until you load your own figures:

  • Labour day rate (days)
  • Brickwork (m²) and blockwork (m²)
  • Concrete (m³)
  • Skip hire (each)
  • Materials (allowance)
The pre-send check in TradeQuote, using fictional data.

Calculators for the ground and the walls

The bricks and blocks calculator works out quantities for the walls, the sub-base calculator handles what goes under the slab, and the area calculator turns measurements into m² lines. It all feeds a materials list you can hand to your merchant.

The extension items that get left off

Before a five-figure price goes out, TradeQuote asks about the items builders most often miss:

  • Access equipment, temporary propping and fire protection to steel
  • Excavation and sub-base
  • Tanking or waterproofing
  • Structural engineer and building control, plus building control and planning fees
  • Part P notification, electrical testing and the certificate
  • Skips or waste removal, then a final clean at handover
A fictional customer quote page with options to choose.

Your own history as a second opinion

Price the blockwork far off what your firm has charged before and that line gets questioned. The check also wants the scope and exclusions written down, payment terms agreed, the site address filled in and nothing left at £0. Put your costs in and it warns when the margin on the extension sinks below the one you're aiming for.

Builders quoting software UK clients can accept on their phone

Offer options on one quote, say with and without the utility knock-through, and the client picks. The quote reaches them as a link on WhatsApp, in a text or by email, and they accept with a tap on their phone. Next they pick a start week you're free, and the job books itself into your diary. Cancellation terms, the client's 14-day legal right to pull out included, are settled before a spade goes in. If the steel price moves, withdraw the link.

A fictional TradeQuote invoice with payment history.

Paperwork on the checklist, out of the glovebox

Each job keeps a paperwork checklist so nothing is missing at handover. TradeQuote doesn't issue or approve any of it. Its part is holding the list and prompting you about it.

The job runs in steps: site set-up and protection, groundworks or demolition as agreed, the main build stage, making good and clean-up, then the walk-round and handover.

  • Building Control notice and completion certificate, where required
  • Party Wall notices, where required
  • Structural calculations or drawings on file, where required

Building contractor invoice software for stages and retention

Tap once: the accepted figure is your first invoice. Raise a deposit before the merchant delivers, take part payments while the shell goes up, or invoice each stage with retention held until the snagging's done. Working under a main contractor? CIS is taken off right there on the invoice, and a running report shows contractors' deductions from you.

Stage one at 20% VAT, a 5% or 0% line beside it: each line takes its own rate, under your firm's logo. Clients paying by card pay straight into your Stripe; Stripe charges its normal fee and TradeQuote charges nothing on top. When that payment clears, the invoice brings itself up to date, and refunds are recorded.

A fictional invoice in TradeQuote showing recorded payments.

Between stages, the admin keeps moving

Chasers for overdue stage payments wait for your okay, go out Monday to Friday, and stop dead when the client pays. Nudges on extension quotes nobody's answered are optional, approved by you. A start date picked by the client lands in your diary unaided. Xero takes drafts of your bills, receipts and credit notes for sign-off, or Sage syncs with the VAT broken out, while QuickBooks and FreeAgent take a CSV file. Give a return site visit a due date and the reminder brings a client message already written.

A year costs the firm £199, or it's £19.99 monthly, for one business and one login, and nothing's capped: quotes, invoices, clients, jobs. A full job, opening to final payment, took 24 taps on a phone when we counted. Van, site cabin or home office: phone, tablet or laptop, installed through the browser, and it keeps running with no signal on the plot. The app stores don't list it yet. Clients from Tradify or Traddie import from CSV, shown in a preview you keep or reverse.

What builders want to know

Is there builders quoting software UK firms can use to price an extension in stages?

TradeQuote does it. Start from the extension (stage price) template, use the calculators for bricks, blocks and sub-base, and put your own rates on each line. It never suggests the prices.

Can I hold retention on a stage invoice?

Yes. Stage invoices can carry retention, and the rest of the agreed amount is invoiced as each stage is reached.

Is there extension quote software that handles CIS?

Every invoice shows its CIS deduction, and a report keeps the total main contractors have held back from you.

Does it tell me whether I need Building Control or a Party Wall notice?

No. Whether they're needed is yours to confirm. Both sit on that job's paperwork checklist, and building control comes up when TradeQuote reads your quote back.

Get the extension price out before Friday

Thirty days free without card details, or see a fictional job priced in the /demo walk-through.